SH20 to Airport, Manukau, Auckland – Platipus® Anchors

Cirtex Barrier Mesh

The NZ Transport Agency’s upgrade of SH20A to motorway standard has provided a safer, more reliable route to and from the airport and has increased freight efficiency around South Auckland.

Continue reading

SH23 Waitetuna to Raglan – ECP2

ecp2-cirtex-raglan

NZTA are currently working on a new initiative called ‘The Safe Roads and Roadside program’ to make our state highways safer. NZTA recently deemed a piece of SH23 (between Hamilton and Raglan) as a ‘high risk rural road’.

Continue reading

Takatakahia Slip Repairs – DuraMesh® MSE Wall

takatakahia-slip-banner

A large-scale storm event struck the Coromandel Peninsula late July 2017, leaving a trail of destruction in its wake. One location profoundly affected was SH25a where the Takatakahia stream embankment had suffered extensive scouring from rising water levels.

Continue reading

Tauranga Sea Wall Rock Revetment – DuraForce™

coastal-erosion-tauranga

Drive Crescent in Tauranga was under attack from high flow rates from tidal flow in that area. The project had a short timeframe and needed fast, reliable supply to the site to meet the challenging deadline.

Continue reading

Millwater Development, Silverdale – DuraMat RF

duramat-millwater-cirtex

Millwater is a development complex just north of Silverdale, Auckland. The Millwater project began in the early 2000’s with 3,000 properties being built, housing over 10,000 residents.

Continue reading

Thames Coast Road Rock Revetment – DuraForce™

thames-coast-road

A combination of a supermoon king tide, low-pressure weather system and strong winds made for a perfect storm. The storm hit SH25 between Thames and Coromandel on January 5th, 2018.

Continue reading

Christchurch Northern Corridor – Geoter

Geoter CNC

The CNC Alliance is a project that is being designed and built by a group of companies. The idea of it is that you bring these people or organisations together to construct something that’s got some unique features, and where there needs to be a bit nimbleness and a bit of collaboration.

Continue reading

Kaikoura Rebuild – Stratagrid® & Rainsmart®

kaikoura-case-study

Right on the eve of the long-awaited opening of State Highway 1 at Kaikoura, Cirtex and the NCTIR team are pleased to present this epic case study video.

Continue reading

South Frame Pūtahi Whakatetonga, Christchurch – AluExcel

AluExcel South Frame

The South Frame is a major development in the Central Christchurch Recovery Plan to create high-quality pedestrian spaces connecting the city through a series of laneways building a genuinely prestigious city centre.

Continue reading

Vector Wero, Auckland – DuraMesh® MSE Wall

vector-wero-ariel

The Vector Wero Whitewater Park is a staged project designed to be a world-class tourism destination. It’s New Zealand’s first facility to offer an artificial river and watercourse for recreation, sports, emergency services training, school programs and youth development.

Continue reading