Mackay’s to Peka Peka – Platipus® Buoyancy Anchors

Mackay's Crossing to Pekapeka - V129 Pipe 4

As part of a major state highway upgrade, a 300mm gas pipeline needed to be laid through sandy soils that were prone to a high water table and liquefaction.

Continue reading

Pinesong Retirement Village Slip Repairs – DuraMat

Cirtex Pinesong

Pinesong Retirement Village is located on the coast of Titirangi in Auckland. The main 5 storey building stands tall on a steep cliff face right above the sea, offering fantastic 180-degree views overlooking the Auckland harbour.

Continue reading

M4 Widening, NSW – Platipus® Mechanical Earth Anchors

Platipus M4 Project

The WestConnex is a world-class infrastructure project that will cut 40 minutes from a typical journey between Parramatta and Sydney Airport. Work is underway on the first 7.5km of M4 Motorway being widened to four lanes in each direction between Parramatta and Homebush.

Continue reading

Platform Remedial Works – Platipus Earth Anchoring System

Since modification and construction of the Rosewood platform in the 1960’s, the west side of the Down Main (northern) platform has experienced up to 200mm subsidence.