Haywards Interchange – Rock Faced DuraMesh®

Haywards-Interchange-Wall-2

Mechanically Stabilised Earth Structures (MSE) were required to support SH58 above McDougalls Grove and the off-ramp to Manor Park as part of the interchange improvements.

Continue reading

Takatakahia Slip Repairs – DuraMesh® MSE Wall

takatakahia-slip-banner

A large-scale storm event struck the Coromandel Peninsula late July 2017, leaving a trail of destruction in its wake. One location profoundly affected was SH25a where the Takatakahia stream embankment had suffered extensive scouring from rising water levels.

Continue reading

Kaikoura Rebuild – Stratagrid® & Rainsmart®

kaikoura-case-study

Right on the eve of the long-awaited opening of State Highway 1 at Kaikoura, Cirtex and the NCTIR team are pleased to present this epic case study video.

Continue reading

Vector Wero, Auckland – DuraMesh® MSE Wall

vector-wero-ariel

The Vector Wero Whitewater Park is a staged project designed to be a world-class tourism destination. It’s New Zealand’s first facility to offer an artificial river and watercourse for recreation, sports, emergency services training, school programs and youth development.

Continue reading

Collville Coast Storm Damage Repairs, Thames – DuraGreen System

duragreen

Storm Damage on the Coromandel Peninsular is all too common. Here we see a series of significant slips being repaired using StrataGrid® and soft facings. The contractors were keen to utilise both Cirtex products and our on-site support during construction.

Continue reading

SH4 Dropout Repair – DuraMesh™ Reinforced Soil System

dropout-repair-duramesh

I D Loaders Ltd won the contract for repairing this drop out on State Highway 4 at Te Rimu and chose the Cirtex DuraMesh System for the repair. The slip extended right across one lane and required a 3.6m high wall to reinstate the road.

Continue reading