triton-vault-stormwater-system

Countdown, Rototuna – Triton Vault

Due to various site constraints, the position available to locate the system was limited to an area under the supermarket loading dock and truck accessway. The Engineers needed to be confident that the system could provide the required storage volume…

Read More
kopu-kairoa-logging-road-cirtex-duraforce

Kopu Kairoa Haul Road – DuraForce® WG

PF Olsen was conducting a harvesting operation and encountered some very soft and saturated ground conditions. As harvesting is very time-sensitive and any standing time is loss of production a quick solution to overcome this problem was much needed.

Read More
cirtex-hatelit

Lunn Ave, Auckland – HaTelit® C

Auckland Transport was looking for a long-term design solution that needed to extend the service life of the pavement while lengthening maintenance intervals. HaTelit C was chosen to perform the task.

Read More