cirtex-hatelit

Lunn Ave, Auckland – HaTelit® C

Auckland Transport was looking for a long-term design solution that needed to extend the service life of the pavement while lengthening maintenance intervals. HaTelit C was chosen to perform the task.

Read More
waiomu-duramesh-wall

Waiomu Valley Road – DuraMesh® MSE System

The Waiomu Valley Road is the route that connects Waiomu with the Waiomu Kauri Grove, this road is the only access to an old farm track that creates an entry way for an upcoming subdivision. A retaining wall was required after it failed and collapsed.

Read More
allan-block-takanini-wall

26 Inlet Road, Takanini – Allan Block®

Originally this project was designed using an alternative system. When project engineer Peter Hill, attended the Cirtex Allan Block Seminar with Allan Block President Tim Bott, an Allan Block retaining wall system was considered and deemed the best solution for the commercial development.