When LIC (Livestock Improvement Centre), a rapidly expanding farmer-owned co-operative and an employer of 2000 staff needed to grow its Head Office Carpark in Newstead Hamilton, there was no option other than to develop the space where the current stormwater pond for the site was situated.

This resulted in the need to find storage capacity for 750,000 litres of stormwater to cater for the design storm event required for this site. It was decided that the stormwater needed to be stored in an underground system so the new carparks could cover all available land.

The engineers on the project selected the Triton S-22 Arches due to their large chamber size, and excellent structural properties the Triton offers.

Project Video