- ProductsFeatured ProductsGeotextilesGeogridsStormwaterReinforced Soil SystemsBlock Retaining SystemsGravity WallsGabionsSediment Retention PondsSite SuppliesSilt ControlDewatering & DrainageTurf MattingEarth AnchoringCulvert FlumesDrainage CompositesErosion Control MattingPermeable PavingImpermeable LinersPavement SurfaceGeocellsShear Lock®Concrete MattressesRock BagsSurvey SuppliesSheet Piles
- Contact Us
Five Mile Retail Development, Queenstown – Triton
Facebook
LinkedIn
Twitter
WhatsApp
Project Details
Contractor
Wilson Contractors
Client
Five Mile Retail Development
Engineer
Clark Fortune McDonald & Associates
Location
Queenstown
Cirtex Regional Contact
Project Information
The Five Mile retail development site is part of the rapidly expanding Frankton Flats development in the Queenstown. Constructing such a large commercial development on silty soils meant it was essential that a proven Stormwater management system was utilised.
Design
Following extensive market research for a solution that met stringent design requirements, Queenstown based engineers; Clark Fortune McDonald & Associates specified Triton Stormwater arches into the project. During the design phase, Cirtex® worked with Clark Fortune McDonald to ensure the Triton system was going to perform in any storm event considered in the design parameters.
Certification
The Queenstown District Council was very favourable towards the Triton system due to the following outstanding features:
• Unique self-flushing main header row for exceptional long-term performance
• Advanced Resin polymer provides unparalleled strength for both dynamic loads and very high long-term dead loads
• Larger chambers offer more efficient use of space as well as faster installation
• Eco-friendly and carbon neutral product
Installation
For Isaac Harrison, Site Engineer for Wilson Contractors, the features of Triton have been an ‘eye-opener’.
Wilson Contractors from Queenstown were the awarded contractor for the installation and completed this task to fantastic standards, with the support of the ‘Cirtex Site Support’ commitment. A big part of a job like this is ensuring adequate preparation, and Isaac believes the speed of the project was in part due to the information available to the team.
Some comments from Isaac from Wilsons during the installation;
“We thought it’d take several weeks. A couple of days in and it’s nearly all underground.”
“We had a pretty good installation guide, with pretty comprehensive instructions from Cirtex,” he says. “That helped us a lot, particularly with pre-installation planning. So there were no surprises when we started in.”
Cirtex Technical Sales Representative Mackenzie Watt provided on-site support. “Mackenzie has been a really good help to us, right from the start,” says Isaac. “He’s always been there to answer any questions – anything we weren’t sure if he was ready with the information.”
Overall the Triton System has been an excellent benchmark for further systems going into the Frankton Flats development and has been a great example of how Cirtex can collaborate with the engineers throughout the design phase and right through to site support during installation.
Products used in this Project
The Triton stormwater system is suited for subsurface stormwater management including infiltration,...
DuraForce AS series geotextile is manufactured and tested to exact quality standards...